Intelligent Contract Management

Prepare for Service Changes.

Don't React to Them.

USPS is rolling out its Regional Transportation Optimization (RTO) initiative nationwide — bringing more frequent service changes, shorter turnaround windows, and cascading updates to routes, rates, and schedules. T3 handles the cascade automatically, so your team is ready before the change goes live.

The Problem

RTO is National. The Turnaround Window is Short.

Changes are coming faster, not slower

RTO means USPS is actively consolidating stops, removing routes, and adjusting coverage on their timeline. Carriers who can’t keep pace fall behind on compliance.

Contracts and operations live in separate systems

When a route changes, nothing in your TMS updates automatically. Someone has to manually bridge the gap, and RTO changes arrive in batches.

Driver reassignments require manual availability checks

A route split means manually checking driver HOS and route history to find the best reassignment — one miscalculation risks a violation.

Changes cascade and compound errors

One missed route boundary update cascades into schedules, assignments, and delivery windows — and USPS compliance takes the hit.

Before vs. After T3

The Same Friday Afternoon. Two Very Different Weekends.

Without T3

Manually update contract records for every affected route

Check driver qualifications one by one against new route configs

Rebuild the trip schedule for Monday from scratch

Update load planning to match new route boundaries

Hope nothing was missed — and find out Monday morning if it was

With T3

Upload your new contract

Get a clear breakdown: routes modified, added, or deactivated — and every rate update

See affected loads and qualified drivers at a glance

Set the effective date and click Apply — updates cascade automatically

Monday morning, every route reflects the new contract. Correct rates, right drivers, no missed loads.

How T3 Solves It

One Platform for Contracts, Changes, and Compliance.

Contract management and service change handling live in the same system where loads are planned and dispatched — so what’s in T3 always reflects what’s actually agreed.

Upload & Let T3 Handle the Rest

Upload your new USPS contract and T3 immediately parses it — summarizing every change to routes, stops, linehaul rates, and fuel rates in a clear, readable UI.

See Exactly How Many Loads Are Affected

T3 shows you precisely how many loads will be automatically updated — and flags which ones will need to be rescheduled so nothing falls through the cracks.

Driver-Ready Recommendations

T3 highlights which drivers are qualified and available to run the updated loads — CDL class, route history, and availability checked automatically, no manual lookups.

Set the Date. Click Apply.

Select your effective date, click Apply, and T3 runs load updates, driver schedule recommendations, and linehaul and fuel rate changes — all in one pass.

How It Works

From Notification to Monday Morning in Four Steps.

01

Upload your new contract

Drop in your updated USPS contract file. T3 parses it immediately and surfaces a clear summary of every change — route modifications, stop consolidations, removals, and rate updates — so you understand exactly what’s different before you do anything.

02

Understand the load impact

T3 generates a detailed report of every affected load — what changed and what needs manual rescheduling — ready to hand off to ops for a clean knowledge transfer. No hunting through schedules, no re-explaining from scratch.

03

Review driver recommendations

T3 highlights which drivers are ready and able to run the affected loads — automatically checking qualifications, CDL class, and availability against the new route configurations. You see who’s ready, who needs reassignment, and why.

04

Set effective date and click Apply

Select when the changes go live, then click Apply. T3 runs load updates, pushes driver schedule recommendations, and updates all linehaul and fuel rate changes in one pass. No spreadsheets. No manual cascades. No Monday morning scramble.

Know What's Affected Before It Goes Live.

See how T3 handles service changes automatically — so your team spends Friday afternoons planning, not scrambling.